EV Charging for Businesses: Planning Around Where Vehicles Actually Park
The economics of an electric vehicle depend less on the vehicle than on where and how it is charged. The data points one way.
A business that buys electric vehicles and then asks where they will charge has the order wrong. Charging determines running cost, vehicle availability and, often, which vehicle makes sense. The International Energy Agency's Global EV Outlook 2026 gives a clear picture of how charging works in practice.
Most charging is private and slow
The IEA estimates that private charging points for light vehicles exceeded 43 million worldwide in 2025, supporting about 76 million electric light-duty vehicles. Public charging points, by comparison, totalled more than 7 million at the end of the year, after nearly 1.8 million were added.
The pattern of use matches. The report cites survey evidence that owners charge privately, at home or at a workplace, almost 75% of the time, and at public fast chargers only about 10% of the time.
The lesson for a business is the same as for a household: the vehicle should charge where it already spends its idle hours.
Three speeds
The IEA uses these definitions:
- Slow: up to and including 22 kW;
- Fast: above 22 kW and up to 150 kW;
- Ultra-fast: 150 kW and above.
Faster is not automatically better. Higher power costs more to install, may need a larger grid connection, and is only useful if the vehicle can accept it. The IEA notes that only about 30% of battery electric cars today can benefit from ultra-fast charging.
What it costs to run
The report states that battery electric cars charged at home produce significant cost savings compared with driving a conventional car, and puts annual running-cost savings across major markets at between USD 550 and USD 1,000 since 2020.
Public charging changes the sum. Public slow charging can cost up to 150% more than residential electricity tariffs, and fast charging up to 240% more. The IEA concludes that relying exclusively on public fast charging would result in higher running costs than a petrol car.
For a fleet, that single finding justifies the effort of installing charging at base.
Depot charging for commercial vehicles
For vans, buses and trucks the report is direct: depot charging is a crucial element of heavy-vehicle electrification, and in its projections depot chargers still account for 99% of all heavy-vehicle chargers in 2035. Depot chargers typically deliver 50 to 150 kW, far less than the high-power units used for en-route charging, because vehicles are parked for hours.
It also names the commonest obstacle. Delays in obtaining grid connections remain a major bottleneck. A depot project should start with the electricity supply, since that has the longest lead time.
Public infrastructure varies widely
Businesses whose vehicles travel beyond their base need to know what exists along the route. Availability differs sharply between markets. The IEA counts about 11 electric light vehicles per public charging point worldwide in 2025, ten in China, 11 in the European Union and 33 in the United States. In newer markets the network is thinner still, which strengthens the case for vehicles that can return to base or use removable batteries.
A planning sequence
- Record how the vehicles are used. Daily distance, routes, and where and for how long each vehicle is parked.
- Match charging to dwell time. Overnight parking suits slow charging. Short turnarounds may justify fast charging for some vehicles.
- Check the electricity supply. Ask the utility what capacity is available and how long an upgrade would take.
- Manage the load. Smart charging spreads demand across the night and avoids paying for a peak the site does not need.
- Choose vehicles after the charging plan. Battery size and charging speed should fit the duty, not exceed it.
- Plan for the exceptions. Identify public charging for longer trips and what happens when a charger is out of service.
- Count the whole cost. Vehicle, charger, installation, grid connection, electricity, maintenance and residual value, over the period you will keep the vehicle.
- Settle who pays for electricity where staff take vehicles home.
Smaller vehicles, simpler answers
Electric bikes, scooters and light delivery vehicles usually charge from an ordinary socket, often with a removable battery. The planning is simpler and still matters: a safe charging area, original chargers, and no charging of damaged batteries.
Electrical work should be designed and installed by qualified professionals in line with local regulations.
Within PALM GROUP, electric mobility is represented by EGO Electric and Coswheel Egypt. The figures above are the IEA's.